Should You Gut Or Remodel Your Bathroom?

When planning a bathroom renovation, many homeowners are faced with whether to remodel or gut the whole thing. The decision is problematic because it involves significant changes to plumbing lines. In the end, choosing between a gut and replace project and a renovation can save you time and money in the long run. However, it would help if you kept in mind that a bathroom renovation can be costly, so you must understand the costs and timeframe of each option.

 

Remodel vs. renovation

A remodelling project changes the basic structure of a room, while a renovation alters the room’s primary function. So, when planning a bathroom renovation, it’s essential to know the difference between a remodel and a renovation before contacting a contractor. By doing so, you’ll be able to communicate with the contractor more effectively. And, if you have a particular vision in mind, you’ll be able to get the perfect outcome. Consult https://www.nulookreno.com.au/bathroom renovations Canberra professionals for details.

 

When choosing between a renovation and a remodel, you should consider whether you need to replace the entire bathroom or just part of it. A renovation may not be necessary, but replacing old drywall is more expensive than preparing the old one for a new texture. However, a bathroom renovation can increase the value of a home by as much as $1.71 per square foot. It will also add a lot to the property’s resale value, so you may as well consider this when choosing a remodelling firm.

 

Gut and replace

A gut and replace in bathroom renovation is a standard renovation method that can save you money and time. The finished materials are removed when you gut a room, including the wall and floor coverings. Unfortunately, this can reveal hidden problems, such as plumbing or electrical wiring. To avoid mistakes, you should seek professional help for the job. Gutting a bathroom can be daunting, so hiring a professional is a good idea.

 

Choosing between a gut and a replacement in bathroom renovation is a matter of taste and budget. Gut and replace projects tend to run over budget, and there is also the potential for unexpected structural issues. Additionally, they take longer to complete, which raises labour costs. You might also want to consider tiling only half of the walls rather than the whole wall. If you don’t like the look of the entire tile wall, you can choose a half-wall tiled bathroom.

 

Costs

The bathroom renovation cost is often hidden within the walls and materials used. The overall cost of a remodel is mainly dependent on where you live. In cities with lower living costs, completing the same work will be considerably less than if you were to do the same work in a higher-cost city. Expect to pay around 20% more for a bathroom renovation in a high-cost area. However, there are ways to cut costs without compromising the quality of the result. Consult https://www.nulookreno.com.au/ bathroom renovations Canberra professionals for details.

 

A small bathroom renovation can cost around $6,500 on average, but the exact cost depends on its size, the type of fixtures and the materials used. A reasonable budget would be $60 to $120 per square foot, while a luxury bathroom may cost $250 or more. The labour costs for bathroom renovations also vary by area. For example, a professional plumber’s fee for removing a single wall can cost between $50 and $120 an hour.

 

Time frame

The time frame for a bathroom renovation will depend on the scope of work. While the average bathroom remodels will take about three and a half weeks, it can stretch to nine weeks if you’re doing significant work. Of course, this time frame assumes everything goes as planned, the contractor is good, the materials are readily available, and you don’t issue change orders. Nevertheless, estimating how long it will take before you can expect the completed project can’t hurt.

 

Demolition of the existing bathroom will require a minimum of two days and may take more if the contractor is unfamiliar with building regulations. The demolition process will take longer if the contractor doesn’t deal with the building board and doesn’t have experience with building codes. Additionally, if you choose a labour-only contractor, you’ll likely need to hire someone with some experience working with building codes.

 

 

 